Once a permit has been issued by the local city or county, construction can begin. Initially, we will complete any grading, footings, and foundation, as required. A portable toilet and trash container will be on-site for the duration of the project. The structure will be constructed quickly in most cases, and then slow down as we focus on all the interior details. Required inspections will happen periodically throughout construction.